|
Do it yourself
| |||
| ||||
Fuse box and fuse positioning of the Volkswagen Passat
Model: Volkswagen Passat
B7
- Years 2010-2014
Today we will discover the positioning and layout of the external fuses of the Volkswagen Passat 2.0 TDI, following the instructions below. First of all, we open the hood and start removing the plastic cover found at the top right, next to the battery, thus accessing the external fuse box; inside the cover we usually find the layout and diagram of the fuses, which can also be found in the vehicle's owner's manual, as shown in the video. At this point, we replace any faulty fuse with a new one, respecting the amperage!
Posted on 30 July 2024 by ScegliAuto
Video tutorial
Related tutorials
Volkswagen Passat
(2010-2014 /
B7)
Today we will discover the instructions on how to identify the layout and positioning of the fuse boxes of the Volkswagen Passat, in simple steps. Fi…
Volkswagen Passat
(1996-2005 /
B5, 3BG)
Today we will discover the steps that will allow us to identify the layout and positioning of the fuse boxes of the Volkswagen Passat. First, we open…
Volkswagen Passat
(2005-2010 /
3C, B6)
Following these brief instructions, we will see how to locate the position and layout of the internal fuse box of the Volkswagen Passat. First, let's…
Other guides you may be interested in
|
Installation of Upgraded Intercooler Radiator with Pipes
Lift the vehicle on suitable axle stands, remove the front wheels, and then the front bumper and grille. Proceed to remove the front headlights; drain the coolant, remove the intercooler radiator and the hoses connecting it to the intake system. Position the new intercooler radiator in the grille, temporarily securing it with cable ties, and mark with a marker the part of the metal that needs to be removed to allow the new hoses to pass through. Cut the marked portion of metal and apply a gasket to the edge. Remove the inner cover of the bumper and position it near the radiator to identify any interfering parts to eliminate: again, apply a gasket to the edge of the cut. Create brackets for securing the new radiator and proceed with the installation of the connecting pipes from the radiator to the intake, shaping and connecting them appropriately. Finally, reassemble the bumper, headlights, and grille. by ScegliAuto More videos
|
|
For advertising on this site Write to info@scegliauto.com
ScegliAuto is not responsible for any inaccuracy of the data in the lists. To report any inaccuracy or your business (if you own the business in question), please write to info@scegliauto.com
Number of seconds to generate the page: 0.153
(c) ScegliAuto 2026 - info@scegliauto.com - Privacy policy VAT number: IT01247470535 |